Tourism horizon · Fly-to-Cruise model

Cruise Terminal and Airport

A passenger terminal independent from the cargo operation, integrated with its own runway. Southern Peru joins the Pacific cruise circuit without relying on another city's airport.

200–300m
Passenger pier
Draft 8–12 m
40–90k
Projected passengers / year
20–30 calls annually
<45min
Air–sea connection
Fly-to-cruise model
PPP
Development scheme
Public–private partnership
The model Fly-to-cruise

Own airport, own pier

Most cruise ports in the South Pacific rely on an airport hours away. Here, the passenger steps off the plane and reaches the pier in under 45 minutes — the same standard used by leading Caribbean fly-to-cruise ports.

The passenger terminal is located separately from the port terminal's cargo area, with independent access and operation, avoiding any conflict between industrial logistics and tourism.

Passenger experience Gate to deck

From the runway to the pier

01

Landing

Its own runway integrated into the project, with no reliance on outside airports.

02

Transfer

Direct ground connection between the air terminal and the sea terminal.

03

Boarding

Passenger terminal independent from the cargo operation.

04

Departure

200–300 m pier, 8–12 m draft, for medium and large cruise vessels.

Minimum connect time (MCT) target, air to sea: under 45 minutes.

Why here Site conditions

What southern Peru doesn't have today

No port in southern Peru combines sufficient draft for medium-sized cruise vessels, its own airport, and direct access to a region with an established tourism offering — Colca, Arequipa, the southern Andean corridor.

Pre-feasibility study phase PPP scheme under evaluation
ConditionStatus
Draft available for passenger pier8–12 m
Land for air terminalAvailable within parent property
Conflict with cargo zoneNone — separate terminals
Communities / social licenseNot required

Source: Cruise Terminal and Airfield Project · 2026 Master Plan.

Let's discuss the development of this line

We are seeking cruise lines, tour operators, and public counterparts interested in developing this under a PPP scheme.