Capesize up to 300,000 DWT on a natural seabed. Mineral pipeline, rail terminal, and enclosed conveyor belt, serving the southern Andean mining corridor and the bi-oceanic outlet to Bolivia and Brazil.
The survey records depths of 18 to 27.7 meters off the projected berth line. The design operating draft is set at 20 meters — sustained by the natural seabed, with no initial or maintenance dredging. That saving translates directly into a lower tariff and lower construction risk.
| Port | Country | Draft | Class | Capacity |
|---|---|---|---|---|
| Puerto Pacífico Sur | Peru | 20.0 m | Capesize | 20 Mt |
| Mejillones | Chile | 18.0 m | Capesize | 25 Mt |
| Antofagasta | Chile | 16.0 m | Panamax | 18 Mt |
| Ilo | Peru | 11.0 m | Panamax | 6 Mt |
| Matarani | Peru | 9.75 m | Handymax | 7 Mt |
Design operating draft. Source: 2026 Master Plan · South Pacific ports benchmark.
A 6,000 t/h shiploader loads a 180,000 t Capesize vessel in 30 hours of effective operation. Including berthing and unberthing maneuvers, the full cycle per ship is estimated at 36 hours.
The catchment area covers the main mining basins of the southern Andes and connects with the bi-oceanic corridor toward Bolivia and western Brazil — the same hinterland logic that underpins neighboring Corío.
Reference production volumes. Hinterland: Arequipa, Moquegua, Tacna, Apurímac, Cusco, Puno.
Engineering studies, definitive bathymetry, and filings with APN, DICAPI, MTC, and SENACE.
Permits and authorizations. Closing of financial structure and operating partner.
Construction begins: marine works, pier, operations yard.
Projected commercial operation.
Includes detailed bathymetry, financial model, permitting timeline, and proposed corporate structure. Delivered under a confidentiality agreement.